Portfolio Existing unreinforced chimney was re-built from roof line up and a gas insert installed. Limestone install around fireplace. Existing brick chimney was damage during an earthquake. Replaced brick chimney from the attic floor up, wth a wooden chase and metal liners. Stuccoed over chimney, matching stucco on house. Existing masonry chimney was broken at roof line, had no flue liner and damper. Also repairs were needed to fire box and smoke chamber areas. Masonry chimney was re-built from shoulder up, to required building codes, matching existing look of old. Existing brick fireplace and chimney was removed. A new zero clearance gas fireplace installed, with limestone installed around fireplace. Outdoor fireplace, BBQ and seating area, made out of river wash stone. Unreinforced brick chimney was replaced with a metal pipe liner from the attic floor up. Existing brick chimney was broken at roofing line. Re-built chimney from smoke chamber up with a wooden chase and metal pipe. Stucco was added over chimney to match house and a wood burning insert installed. Existing brick chimney was re-built from the roof line up. Cultured stone added around fireplace. Damage chimney re-built form roof line up, re-using existing stones. Stone chimney, re-built from roof line up. Cultured stone was added over existing brick chimney top. Brick chimney re-built from shoulders up to required building code. Repairs were made to smoke chamber and firebox area. Gas line added to fireplace, for a log lighter. Cultured stone was added over existing brick chimney top. Culture stone was added over existing brick chimney. Masonry chimney re-built form smoke chamber up. Decorative brick design top added. Gas logs installed with on/off wall switch. No more spare the air days to worry about. Existing masonry chimney was re-built from roof line up, with a chase and metal pipes. The existing bricks were cut to make a thin veneer and installed over chase, matching existing look of old. The upstairs fireplace had a draft issue, that was solved during new construction. Also repairs had to be made to both fireplaces. Outdoor wood burning fireplace, with dry stack stone installed around fireplace. Damaged brick chimney was re-built from roof line up, with natural stone. Brick repairs were made and a new metal top installed. Brick chimney re-built from attic floor up. Chimney was pulling away from guest room. Repaired from top of smoke chamber up and re-pointed lower mortar joints. A top damper and spark arrestor was installed. New brick fireplace and insert. Existing brick chimney was re-built from the roof line up. Installed a new fireplace, with gas logs and a new screen. Outdoor wood burning fireplace, with dry stack stone installed around fireplace. BBQ built, with connecticut blue flagstone. Gas line added to fireplace, wtih gas logs. No more spare the air days to worry about, no more ash to clean out of fire box and it can be turned on and off, by a flick of a switch Culture stone added over existing brick fireplace, with a new wooden matel. Brick chimney re-built from attic floor up. Existing masonry chimney was removed. A new zero clearance gas fireplace installed, with marble installed around fireplace. Clinker brick chimney was re-built from smoke chamber up, re-using existing bricks. A new wood burning zero clearance fireplace installed, with california gold flagstone installed around fireplace. Gas log set up with on/off wall switch. Removed existing brick chimney from attic floor up and installed a light weight metal pipe liner. Masonry chimney re-built from smoke chamber up. Decorative brick design added to top. Wood burning insert. Existing masonry chimney was broken at roof line, had no flue liner and damper. Also repairs were needed to fire box and smoke chamber areas. Masonry chimney was re-built from shoulder up, to required building codes, matching existing look of old. A gas insert was installed into existing masonry fireplace and new tile work installed around fireplace. BBQ built, with connecticut blue flagstone. Existing brick chimney, slid of the roof during an earthquake. Replaced brick chimney from attic floor up with a wooden chimney and metal liners. A thin brick veneer was installed over wood framing area above roof, matching existing look of old. Tile fireplace (for looks only, not a functional fireplace). Brick chimney re-built from roof line up. Thin brick veneer, added over wood frame chimney. A new wood burning zero clearance fireplace installed, with california gold flagstone installed around fireplace. Thin brick veneer, added over wood frame chimney. Outdoor fireplace, BBQ and seating area, made out of river wash stone. 2013-05-06
Comments are closed, but trackbacks and pingbacks are open.